Preparing the floor for the construction. |
Putting the tiles for the combustion chamber into water to cut them. |
Cutting the tiles with an angles grinder. |
Tiles already cut. |
Laying the cinder blocks 4-high for the stove. |
Filling in with ash and glash. |
Cutting 2 blocks in U for the entrance and the exit. |
Placing the steel hot plate. |
Building the chiminey exit with bricks. |
Rendering with white cement. |
Leave to dry for 3 days before using. |
|